Fans254 Help Center

Tutorial · Fans254 Help Center

Set ad budget, duration and ongoing delivery

Review KSh daily budgets, campaign estimates and Run until I cancel.

· 2 min read

Overview

The Ads Manager Budget & Duration page shows spending controls and illustrative performance estimates. A planning estimate is not a payment or performance guarantee.

Choose campaign spending and duration

  1. Open Budget & Duration. Complete the prior campaign stages and save Target Audience.
  2. Set Daily budget (KSh). Enter an amount within the current minimum and maximum shown in the field. The slider and presets can help preview alternatives.
  3. Choose fixed duration. Enter the number of days within the displayed limit when you want a scheduled campaign end.
  4. Review the continuous option. Run until I cancel is optional. If enabled, additional delivery may use wallet refills while funding and eligibility allow.
  5. Inspect the estimator. The clicks and impressions are illustrative, based on current reference rates, and may differ from actual delivery.
  6. Continue to Preview. Saving a budget does not charge or approve the campaign; proceed to review and payment.

Know what the budget controls mean

The Daily budget field expresses the campaign budget in KSh. A fixed duration sets the intended number of days, while an ongoing option may continue spending only while funds, campaign eligibility and the relevant controls permit. An estimate of reach or clicks is a forecast, not purchased results.

  • Inspect the minimum and maximum shown by the editor; these can be changed through platform configuration.
  • The initial funding and subsequent wallet deductions are not the same thing. Review the continuous-delivery choice before authorising payment.
  • If the payment provider uses a different checkout currency, confirm the final payable amount before completing the transaction.

Check the campaign budget

The budget summary should show the initial funded amount and duration or continuous setting. The campaign must still satisfy review and funding requirements.

Budget limits and estimates

If minimum amounts change with site configuration, use the current editor’s values, not a static online example. A card checkout may show another currency; compare the final provider amount before confirming.

Avoid guaranteed performance claims

Do not mistake estimated clicks for guaranteed clicks or revenue.

Was this information helpful?

Your feedback helps us improve our articles.